| Lots of Updates:Approx $120,000 concrete placed in 2021:
-added outdoor patio area
-additional parking along patio
-removed water damaged area and placed new pad for drive thru building area—downspout had caused the water damaged concrete so moved the downspouts
-extended concrete for drive thru menu board area
-extended concrete outside drive thru area
Added door going to patio ($4,000)
Added drive thru building and its connection to main building 2022 for approx. $100,000 with triple sink, hand sink, ice maker
Installed three large digital outdoor menu boards and speaker/microphone in 2022 with five-year warranty still good until 2027 for approximately 35,000.
Remodeled inside of bank 2022-23 (approx. $300,000)
-all new flooring
-new dividing wall between kitchen and dining
-installed kitchen hoods, makeup air, new electrical wiring, hand sinks, prep sink, bar triple sink, frp walls, and moisture resistant ceiling tile
-installed dumbwaiter ($30,000)
-dug out basement flooring in dish pit room to install grease trap
-dish pit & prep room new tile floor and frp walls and new moisture resistant ceiling tile
-Walkin fridge upstairs and both Walk-in fridge and Walk-in freezer downstairs
-new tile flooring on stairwell and landings
-enclosed dumpster area with new concrete pad and vinyl fencing
-lots of plumbing & electrical work
-irrigation system moved from dried up well onto city water and corrected the coverage
-installed water softener and reverse osmosis 2022
-new LED ceiling lights in kitchen, dining, and dish pit rooms ($6,000)
-added fiber optic wiring to building via Premier Communications
-Cat6 cable and security cameras
The dishwasher is owned; it is high temperature without need for hood ($30,000 w/install)
New large capacity water heater 2021 with efficient boiler system ($30,000)
New parking lot lights
New LED signs and an electrical outlet to front sign along Highway
Directional boring to connect sump pump to city sewer ($20,000)
In 2023 installed new 800Amp 3phase electrical system (approx. $100,000) with new transformer
2024: Finished roof area of makeup air with steel roofing |